(03) 9802 9459

Suburb

Building Surveyor Gisborne and the Macedon Ranges

Fixed-⁠fee building permits, inspections and sign-⁠off for new homes, extensions, sheds and outbuildings across Gisborne, Woodend, Kyneton, Romsey, Riddells Creek and the rest of the Macedon Ranges.

Get a fixed-fee quote(03) 9802 9459We reply as soon as we can.

The Macedon Ranges is a mix of commuter towns, lifestyle blocks and farmland, and nearly all of it is bushfire country. Cornerstone issues building permits across the Shire — Gisborne and New Gisborne, Riddells Creek, Macedon and Mount Macedon, Woodend, Romsey, Lancefield and Kyneton — for every class of building work: new homes, extensions, sheds and outbuildings, and commercial and industrial buildings. One practice accountable for your permit through to sign-off, a fixed fee quoted up front, and inspections on a regular run through the Ranges.

Where the work is

Gisborne and New Gisborne have the most new housing, on estate lots and in-fill blocks, with Riddells Creek and Romsey growing behind them. Estate lots come with building envelopes and design guidelines; the developer’s panel signs off first, then we assess the permit against the Building Regulations 2018 and the NCC. The two are not the same test, so we check the siting before the drawings are finalised.

Out of town the jobs change. New homes on acreage around Woodend, Macedon and Kyneton, big sheds and workshops, stables and outbuildings, and extensions and decks on older houses. Sloping sites in the hills bring cut and fill, and the retaining walls that result are often a metre or more, which needs a permit and an engineer’s design. In the town centres, shop and office fit-outs get the same permit and inspection service as the houses.

What the land adds

Bushfire comes first in the Ranges. Most of the Shire is a designated bushfire prone area, so a new home or extension needs a bushfire attack level assessment before the drawings are final, and the construction follows from that rating. Mount Macedon and other forested parts are also covered by the Bushfire Management Overlay, where a planning permit and the CFA’s input usually come before the building permit. Get the address to us early and we will tell you which applies.

The ground varies across the Shire, from volcanic soils to granite and clay. The soil report sets the class, and the slab and footings are designed to it. Rural lots without town sewerage also need council’s approval for the wastewater system, which runs alongside the building permit.

Nearby

We cover the Calder corridor on the same run, up to Bendigo, and Sunbury and Diggers Rest on the Melbourne side. See our regional Victoria page for how regional work runs, or northern Melbourne for the growth corridor next door.

Services in the Macedon Ranges

What we permit here

Every class of work, fixed fee, one practice from permit to sign-off.

New home permits

Building permits, mandatory inspections and occupancy permits for new homes, dual occupancies and townhouses — one practice from the first drawing to the day you move in.

Every new dwelling needs a building permit before work starts, staged inspections during the build and an occupancy permit at the end.

01

Multi-⁠unit development permits

Building permits, mandatory inspections and staged occupancy permits for dual occupancies, townhouse rows and small apartment buildings — one practice and one fixed fee per job.

Every new dwelling needs a building permit before work starts, and two or more on a lot almost always need a planning permit first.

02

Shed & garage permits

Garden sheds, workshops, farm sheds and garages — permits issued for a fixed fee — contact us and we'll tell you whether you need one at all.

Permit usually needed over 10 m², near a boundary, or with a slab and power.

03

Retaining wall permits

Sleeper, block, boulder and concrete retaining walls — permits, engineer's design checks and inspections for a fixed fee, with a free answer on whether your wall needs one.

Permit needed at 1 m or more, near a boundary, or when the wall holds up a driveway, structure, pool or a neighbour's ground.

04

Verandah, pergola, carport & deck permits

Roofed verandahs, alfresco roofs, open pergolas, carports and decks — we tell you for free whether yours is exempt, check the siting, and issue the permit for a fixed fee if it needs one.

Permit usually needed for a roofed or attached structure, a carport or a deck. Small open pergolas can be exempt.

05

Demolition permits

Demolition permits for knock-down rebuilds, outbuildings and partial demolition — Section 29A consent, services and asbestos lined up in the right order, for a fixed fee quoted up front.

Permit needed to knock down a house, most outbuildings or part of a building. Council Section 29A consent comes first.

06

Commercial fit-⁠out permits

Building permits, occupancy permits and change-of-use assessments for shop, office and warehouse fit-outs — one practice, fixed fee, fast turnaround times.

Permit needed for new walls, ceilings, amenities, exits, fire separation or a change of use.

07

Extensions & renovations

Ground-floor extensions, second storeys, structural renovations and dual-occupancy conversions — building permit, mandatory inspections and final sign-off from one practice, for a fixed fee.

Permit needed for extensions, second storeys, removing load-bearing walls and most structural changes. Cosmetic work usually not.

08

What clients say

Cornerstone Building Surveyors have been a great asset throughout our building process. Frank, in particular, has been excellent to deal with — professional, prompt, and always willing to offer clear guidance and support. His experience and attention to detail make the construction process a smooth and easy trip to completion. Highly recommend Cornerstone to anyone in the building industry looking for reliable and efficient surveyors.

TomCon HomesBuilder

FAQ

Building permits in Gisborne and Macedon Ranges: common questions

Short answers. If yours isn't here, ask us directly — it's usually a one-line reply.

01Can a private building surveyor issue my permit in the Macedon Ranges?

Yes. Under the Building Act 1993 you can appoint a registered building surveyor for a site anywhere in Victoria, so you do not have to go through the Macedon Ranges Shire Council's building department. Council still receives a copy of the permit and still handles the planning side, which in the Ranges is often part of the job.

02My block is in a bushfire prone area. What does that mean for the permit?

Most of the Macedon Ranges is a designated bushfire prone area. A new home or extension there needs a bushfire attack level (BAL) assessment, and the construction — glazing, decking, roof and sub-⁠floor details — has to meet the standard that follows from it. Where the land is also in a Bushfire Management Overlay, a planning permit is usually needed first. We tell you which applies at the quote stage.

03Does a shed on a lifestyle block in Gisborne or Woodend need a permit?

Usually, yes. A small freestanding shed can be exempt: the key threshold is 10 square metres of floor area, with limits on height and siting. Most sheds on acreage are well beyond that. The farm-⁠building exemption only applies where council grants it for land used for farming, in writing. Run it through our [shed permit checker](/shed-⁠permit-⁠checker), or send us the supplier's drawings and the address and we will tell you before you order.

04How do inspections work in the Macedon Ranges?

The Ranges are on our regular Macedon Ranges and Bendigo inspection run, and Gisborne and Riddells Creek are close to our northern Melbourne work. Email inspections@cstonebs.com with the permit number and the stage when it is coming up, and it goes on the next run through the area.

Get a quote

Building in Gisborne and Macedon Ranges? Send the plans.

No drawings yet? Send what you have — an address and a rough idea is enough to tell you whether you need a permit and what it'll cost.

Request a quote
(03) 9802 9459Mon–Fri, 9:00 am – 5:00 pmWe reply as soon as we can.