(03) 9802 9459

Suburb

Building Surveyors – Melton

Building permits, inspections and sign-⁠off for new homes, extensions, sheds, retaining walls, knock-⁠down rebuilds and townhouses across Melton and the City of Melton.

Get a fixed-fee quote(03) 9802 9459We reply as soon as we can — typically within two business days.

Melton sits on Melbourne’s western edge in the City of Melton, and the building work there falls into two camps: the older satellite-city township and the new estates around it. Cornerstone issues building permits, carries out the mandatory inspections and signs off the finished job for homeowners, builders, drafting firms and small developers across both.

You deal with one practice from permit to occupancy permit, with a fixed fee quoted before any work starts and fast turnaround times. We work across Melton every week, so inspections are easy to schedule.

Local knowledge in Melton

Melton was set up as a satellite city in the seventies, and the houses from that push — Melton West, Kurunjang, Brookfield and the older streets of Melton South — are mostly brick veneer on blocks with room to spare. That is where the extensions, second dwellings, knock-down rebuilds and big sheds are. A knock-down rebuild needs a demolition permit and Section 29A consent alongside the new-home permit, and we run the two together so the timing works.

The estates are a different job. Atherstone at Strathtulloh and Cobblebank, Weir Views, Harkness, Thornhill Park, Bridgefield at Rockbank, Woodlea at Aintree and Eynesbury are producing new homes and townhouses on small lots with developer design guidelines. Bonnie Brook, Deanside, Fraser Rise and Plumpton are the newer fronts on the same corridor, and Diggers Rest is filling in north of the freeway. The estate approves the facade first; we then assess the siting against the Building Regulations 2018 and the NCC, and the two do not always agree. A garage or porch the guidelines allow can still need a report and consent from council, so we check before the drawings are finalised.

Underneath all of it is the basalt plain. The clay that weathers off it is reactive, and rock sits close to the surface in parts of Melton, so we look for a soil report and an engineer’s footing design on nearly every job, slab sheds and garages included. Shallow rock also changes footing depths and retaining wall design where lots have been cut and filled.

Overlays to check early: land along Toolern Creek and the Werribee River can carry flood controls — a Land Subject to Inundation Overlay or floodway zoning — and several older High Street buildings, the former courthouse among them, carry a heritage overlay. Both are planning matters to settle before the building permit issues. The rural fringe around Toolern Vale, Exford and Parwan is largely designated bushfire-prone, which changes the construction standard. Give us the address first.

Work in demand

Builders in the Toolern and Rockbank estates bring most of the volume: new-home permits and stage inspections. The rest is extensions and knock-down rebuilds in the older township, sheds on the rural-living blocks, retaining walls on cut-and-fill lots, townhouses near the stations, and fit-outs along High Street and the Western Highway.

Nearby

We cover the rest of the City of Melton — Caroline Springs, Taylors Hill, Diggers Rest and Rockbank — plus Bacchus Marsh and Sunbury. See our Werribee and Footscray pages, or the western suburbs page for the whole region.

Services in Melton

What we permit here

Every class of work, fixed fee, one practice from permit to sign-off.

New home permits

Building permits, mandatory inspections and occupancy permits for new homes, dual occupancies and townhouses — one practice from the first drawing to the day you move in.

Every new dwelling needs a building permit before work starts, staged inspections during the build and an occupancy permit at the end.

01

Multi-⁠unit development permits

Building permits, mandatory inspections and staged occupancy permits for dual occupancies, townhouse rows and small apartment buildings — one practice and one fixed fee per job.

Every new dwelling needs a building permit before work starts, and two or more on a lot almost always need a planning permit first.

02

Shed & garage permits

Garden sheds, workshops, farm sheds and garages — permits issued for a fixed fee — contact us and we'll tell you whether you need one at all.

Permit usually needed over 10 m², near a boundary, or with a slab and power.

03

Retaining wall permits

Sleeper, block, boulder and concrete retaining walls — permits, engineer's design checks and inspections for a fixed fee, with a free answer on whether your wall needs one.

Permit needed at 1 m or more, near a boundary, or when the wall holds up a driveway, structure, pool or a neighbour's ground.

04

Verandah, pergola, carport & deck permits

Roofed verandahs, alfresco roofs, open pergolas, carports and decks — we tell you for free whether yours is exempt, check the siting, and issue the permit for a fixed fee if it needs one.

Permit usually needed for a roofed or attached structure, a carport or a deck. Small open pergolas can be exempt.

05

Demolition permits

Demolition permits for knock-down rebuilds, outbuildings and partial demolition — Section 29A consent, services and asbestos lined up in the right order, for a fixed fee quoted up front.

Permit needed to knock down a house, most outbuildings or part of a building. Council Section 29A consent comes first.

06

Commercial fit-⁠out permits

Building permits, occupancy permits and change-of-use assessments for shop, office and warehouse fit-outs — one practice, fixed fee, fast turnaround times.

Permit needed for new walls, ceilings, amenities, exits, fire separation or a change of use.

07

Extensions & renovations

Ground-floor extensions, second storeys, structural renovations and dual-occupancy conversions — building permit, mandatory inspections and final sign-off from one practice, for a fixed fee.

Permit needed for extensions, second storeys, removing load-bearing walls and most structural changes. Cosmetic work usually not.

08

What clients say

Working with Cornerstone Building Surveyors was an absolute pleasure from start to finish. Their team was professional, knowledgeable, and always willing to go the extra mile to ensure everything ran smoothly. Communication was clear and prompt, and their attention to detail gave me complete confidence throughout the process. It's rare to find a company that combines expertise with such a friendly and approachable attitude. Highly recommend!

SimonHomeowner, western suburbs

FAQ

Building permits in Melton: common questions

Short answers. If yours isn't here, ask us directly — it's usually a one-line reply.

01Do I need a building surveyor in Melton?

Yes, for most work. New homes, extensions, second dwellings, garages, most sheds, retaining walls a metre or more in height (lower if they support other building work or a neighbour's land) and many verandahs and decks need a building permit, and in Victoria only a registered building surveyor can issue one. Some small freestanding structures are exempt, but the exemptions have conditions on size, height and boundary setbacks. Send us the details and we will confirm before you spend anything.

02What is the difference between a house building surveyor in Melbourne and a local surveyor?

In practice, none. A registered building surveyor can issue permits anywhere in Victoria, so the same practice handles a new home in Strathtulloh, an extension in Kurunjang and a warehouse fit-⁠out in Derrimut. What matters is whether the surveyor knows how the City of Melton handles report and consent and Section 29A requests, and whether they will actually turn up for the inspections. Cornerstone does both.

03How do I know if I need a private building surveyor in Melbourne?

If your project needs a building permit, you need a building surveyor to issue it. In Victoria that is almost always a private surveyor you appoint directly rather than the council. You appoint one surveyor for the whole job, and their practice sees it through: the drawings are assessed, the permit is issued, the mandatory inspections are carried out, and they sign off with the occupancy permit or certificate of final inspection. Appoint them before work starts, not after.

04Do you work outside Melton?

Yes. We cover the whole City of Melton, including Caroline Springs, Rockbank, Diggers Rest and Eynesbury, plus Werribee, Footscray and the rest of Melbourne's west. Cornerstone works across Melbourne and regional Victoria.

05Do I need a permit for a retaining wall in a Melton estate?

Often, yes. The cut-⁠and-⁠fill pads in Atherstone, Thornhill Park, Weir Views and Woodlea leave level changes along side and rear boundaries, and the walls that hold them are caught more often than people expect. The key threshold is a metre: a wall of a metre or more needs a building permit from a registered building surveyor, and so does a lower wall that is part of other building work, such as a driveway or the house slab, or that holds up a neighbour's land. Only a wall under a metre that stands on its own is exempt. A permit wall needs an engineer's design, and shallow basalt in parts of Melton changes the footing, so the soil report matters. The estate's design guidelines can add their own rules on top. Send us the heights, a site plan and a photo and we will tell you before the landscaper starts.

Get a quote

Building in Melton? Send the plans.

No drawings yet? Send what you have — an address and a rough idea is enough to tell you whether you need a permit and what it'll cost.

Request a quote
(03) 9802 9459Mon–Fri, 9:00 am – 5:00 pmWe reply as soon as we can — typically within two business days.