(03) 9802 9459

Suburb

Building Surveyor Geelong — Permits and Inspections

Fixed-⁠fee building permits, inspections and sign-⁠off for new homes, extensions, sheds, decks, retaining walls and commercial fit-⁠outs across Greater Geelong, the Bellarine and the Surf Coast.

Get a fixed-fee quote(03) 9802 9459We reply as soon as we can.

Geelong is Victoria’s second-largest city and still growing, and most of what gets built here needs a building permit. Cornerstone issues building permits across the City of Greater Geelong, the Bellarine and the Surf Coast for every class of building work: new homes, extensions, sheds and decks, and commercial and industrial buildings. One practice accountable for your permit through to sign-off, a fixed fee quoted up front, and inspections scheduled on regular runs through the area.

Where the work is

Most new-home permits come out of the growth areas. Armstrong Creek, Charlemont and Mount Duneed on the southern side, Lara to the north, and Curlewis, Drysdale and Leopold on the way out to the Bellarine are where estates are still being built. Each lot comes with a building envelope and developer design guidelines. The estate’s design panel signs off first, then we assess the permit against the Building Regulations 2018 and the NCC. The two are not the same test: a garage or porch the guidelines allow can still need a report and consent from council under the siting rules, so we check that before the drawings are finalised.

After handover come the decks, pergolas and carports, sheds and garages and the retaining walls that cut-and-fill lots leave behind. Those are the jobs people most often ask whether they need a permit for, and the answer depends on size, height and where on the block the work sits.

The older city is a different job. Geelong West, Newtown, Belmont, Highton and Hamlyn Heights have older housing on established blocks, where we see extensions, second storeys and knock-down rebuilds. Parts of the inner suburbs carry heritage overlays, which are a planning matter: where a planning permit is needed, it has to be in hand before the building permit can issue. On the commercial side, warehouses and offices in the industrial areas around Corio, North Geelong and Moolap, and shop and office fit-outs in central Geelong and Waurn Ponds, get the same permit and inspection service as the houses.

What the land adds

The plains north and west of the city sit on volcanic basalt, and the clay that weathers out of it is reactive. Closer to the coast and along the Barwon the ground changes again. The soil report sets the class and the slab and footings are designed to it, so we ask for it early on a new home or an extension with new footings.

Low-lying land along the Barwon and parts of the coast are mapped for flooding, and the Surf Coast hinterland and parts of the Bellarine are designated bushfire prone areas. Either can add a step to the permit — council’s report and consent on the floor level, or a bushfire attack level assessment that changes the construction standard. We check both before we quote.

Nearby

We cover the whole region: Torquay, Jan Juc and the Surf Coast, Ocean Grove, Portarlington and the rest of the Bellarine, and Bannockburn out towards Ballarat. See our regional Victoria page for how regional work runs, or our Werribee page for the Wyndham side of the Princes Freeway.

Services in Geelong

What we permit here

Every class of work, fixed fee, one practice from permit to sign-off.

New home permits

Building permits, mandatory inspections and occupancy permits for new homes, dual occupancies and townhouses — one practice from the first drawing to the day you move in.

Every new dwelling needs a building permit before work starts, staged inspections during the build and an occupancy permit at the end.

01

Multi-⁠unit development permits

Building permits, mandatory inspections and staged occupancy permits for dual occupancies, townhouse rows and small apartment buildings — one practice and one fixed fee per job.

Every new dwelling needs a building permit before work starts, and two or more on a lot almost always need a planning permit first.

02

Shed & garage permits

Garden sheds, workshops, farm sheds and garages — permits issued for a fixed fee — contact us and we'll tell you whether you need one at all.

Permit usually needed over 10 m², near a boundary, or with a slab and power.

03

Retaining wall permits

Sleeper, block, boulder and concrete retaining walls — permits, engineer's design checks and inspections for a fixed fee, with a free answer on whether your wall needs one.

Permit needed at 1 m or more, near a boundary, or when the wall holds up a driveway, structure, pool or a neighbour's ground.

04

Verandah, pergola, carport & deck permits

Roofed verandahs, alfresco roofs, open pergolas, carports and decks — we tell you for free whether yours is exempt, check the siting, and issue the permit for a fixed fee if it needs one.

Permit usually needed for a roofed or attached structure, a carport or a deck. Small open pergolas can be exempt.

05

Demolition permits

Demolition permits for knock-down rebuilds, outbuildings and partial demolition — Section 29A consent, services and asbestos lined up in the right order, for a fixed fee quoted up front.

Permit needed to knock down a house, most outbuildings or part of a building. Council Section 29A consent comes first.

06

Commercial fit-⁠out permits

Building permits, occupancy permits and change-of-use assessments for shop, office and warehouse fit-outs — one practice, fixed fee, fast turnaround times.

Permit needed for new walls, ceilings, amenities, exits, fire separation or a change of use.

07

Extensions & renovations

Ground-floor extensions, second storeys, structural renovations and dual-occupancy conversions — building permit, mandatory inspections and final sign-off from one practice, for a fixed fee.

Permit needed for extensions, second storeys, removing load-bearing walls and most structural changes. Cosmetic work usually not.

08

What clients say

I had a great experience working with Cornerstone Building Surveyors. The team was professional, responsive, and extremely knowledgeable throughout the entire process. They made sure everything was compliant and provided clear guidance from start to finish. Communication was smooth, and their attention to detail gave me complete confidence in their work. I highly recommend Cornerstone to anyone looking for reliable and experienced building surveyors.

Matthew YousifHomeowner

FAQ

Building permits in Geelong: common questions

Short answers. If yours isn't here, ask us directly — it's usually a one-line reply.

01Can a private building surveyor issue my building permit in Geelong?

Yes. Under the Building Act 1993 you can appoint a registered building surveyor for a site anywhere in Victoria, so you do not have to go through the City of Greater Geelong's building department. The permit is issued under the same Act and Regulations, and council still receives a copy and still handles anything on the planning side.

02Do I need a building permit for a shed, deck or pergola in Geelong?

Often, yes. A small freestanding shed can be exempt: the key threshold is 10 square metres of floor area, with limits on height and position on the block. A deck attached to the house has no exemption, and a pergola is only exempt within tight limits on size and height. Estate design guidelines in Armstrong Creek, Mount Duneed and Lara add their own rules on top. Our free tools for [sheds](/shed-⁠permit-⁠checker) and [pergolas](/pergola-⁠permit-⁠checker) walk through the regulations question by question, or send us the supplier's drawings and the address and we will tell you before you order.

03How do inspections work for a job in Geelong?

Geelong and the Surf Coast are serviced on regular inspection runs. When a stage is coming up, email inspections@cstonebs.com with the permit number and the stage, and it goes on the next run through the area. Book as soon as the stage is in sight, especially footings and slab, so the pour can be planned around the date.

04My block is near the coast or the Barwon. Does that change the permit?

It can. Land along the Barwon and some low-⁠lying coastal land is mapped for flooding. In a designated flood-⁠prone area, council's report and consent is needed for a new house or most extensions under the Building Regulations 2018, unless a planning permit already controls the floor level; a flood overlay in the planning scheme usually means a planning permit. Parts of the Surf Coast hinterland and the Bellarine's edges are designated bushfire prone areas, which means a bushfire attack level assessment. Give us the address early and we will tell you what applies before we quote.

Get a quote

Building in Geelong? Send the plans.

No drawings yet? Send what you have — an address and a rough idea is enough to tell you whether you need a permit and what it'll cost.

Request a quote
(03) 9802 9459Mon–Fri, 9:00 am – 5:00 pmWe reply as soon as we can.