The Building Regulations 2018 changed three times in the second half of 2026, on top of Victoria adopting NCC 2025 on 1 May. Most of it lands on the siting of houses, so it matters to anyone drawing, building or buying a home. Here is what is different, read from the authorised version of the Regulations as at 27 October 2026, and what it means on a real job.
Siting rules now come from clause 54 (27 October 2026)
Part 5 of the Regulations sets where a house, an extension, and a garage or shed that goes with a house can sit on the block. Until October it carried its own tables. It now points to the standards in clause 54 of the Victoria Planning Provisions — the standards council applies when a house needs a planning permit. The building permit still applies them through the Regulations, and a design that does not comply still needs council’s report and consent.
What that changes in practice:
- Street setbacks. The default is now the lesser of the front setbacks of the houses on either side, capped at 6 m. Before, it was the average, capped at 9 m. With no house on either side the key threshold is 4 m, or 6 m on a street in a Transport Zone 2.
- Site coverage. The cap now depends on the zone: 60% in a Neighbourhood Residential or Township Zone, 65% in a General Residential Zone, and 70% in a Residential Growth, Mixed Use or Housing Choice and Transport Zone. It was a flat 60%. A zone schedule can still set its own figure.
- Side and rear setbacks. The formula barely moved: 1 m, plus 0.3 m for every metre of height over 3.6 m, plus 1 m for every metre over 6.9 m. What changed is that a zone schedule can no longer vary it, or the length of a wall on the boundary.
- Neighbours’ solar panels. A new regulation protects an existing rooftop solar system next door in the General Residential, Neighbourhood Residential and Township Zones. Any part of the building that would shade a panel between 9 a.m. and 4 p.m. on 22 September has to be set back by a set distance from that boundary.
- Overlooking. Bedroom windows are now outside the overlooking rule altogether — a new bedroom window, and a neighbour’s bedroom window. And fixed elements that block the view, such as opaque ledges or vertical fins, now count as a way to comply, alongside high sills, obscure glass and screens.
- Open space, overshadowing and daylight. Private open space, the neighbour’s sunlit open space and daylight to new windows all now follow the clause 54 figures.
Our Part 5 siting calculator has been updated to the new rules for side setbacks, boundary walls and overlooking, with the provision cited on every result.
Small second dwellings (27 October 2026)
A small second dwelling, often called a granny flat, can now have a gross floor area of up to 80 m², up from 60 m². The floor area is measured to the outside of the walls and does not count an attached deck, verandah, pergola or patio. It has to be a Class 1a building on an allotment that has exactly one existing Class 1 building. The specific path-of-access rule for small second dwellings has been removed. The building permit and inspections run like any new dwelling’s — see our new home building permits page.
Flood-prone areas (2026)
The old “area liable to flooding” is now a designated flood-prone area. Under the Building Act 1993 the Minister can designate land with a 1% or higher chance of flooding in any year, and council flood designations made before the change carried over. In a designated flood-prone area, a new house or most extensions still need council’s report and consent, and council can still set the lowest floor level.
What has changed is that a flood overlay in the planning scheme no longer counts on its own for that building step. The overlay is still there, and it usually means a planning permit that sets the floor level. Check both when you buy or before you draw.
Retaining walls (1 September 2026)
Regulation 119, which let council’s building surveyor require retaining walls where excavation or fill affected the ground, has been revoked. The permit exemption for a small retaining wall did not change: a wall under 1 m that is not part of other building work and does not hold up a neighbour’s land can still be exempt. Our retaining wall permit checker walks through the test.
A new information statement for homeowners (1 September 2026)
For a new house or a shed, garage or other outbuilding that goes with one, the building surveyor must now give the owner a prescribed information statement explaining what the building surveyor does and does not do. It has to be given no later than 10 business days after the surveyor applies for the building permit number, by email where the owner has given one, or otherwise by post or by hand. If you are building, expect it in your inbox early in the job.
NCC 2025 (1 May 2026)
Victoria adopted NCC 2025 on 1 May 2026. The change most drafters notice is roof space ventilation: the old figures still printed on many plans are the 2022 ones. Our roof ventilation calculator produces a current notation block.
What did not change
The permit exemptions for small sheds, pergolas and decks are the same. So is the building permit application form, and so are the statutory timeframes for deciding an application. Most of what moved is siting, so the place it bites is the drawings.
If you have a design that was drawn before 27 October and has not been lodged yet, have the siting checked against the new rules before it goes in. Send us the drawings and a site plan, and a registered building surveyor will tell you what, if anything, needs to change.